The Intimate Brooms, Split and Spinal got a ferric patina before their burials in the ground. I plan to have 5 works buried in the ground in two weeks time.
Intimate Brooms
Split
My tolling bell
Spinal with Split and the tolling bell
The top section of “Basin” got a cupric patina tonight. I’m ahead of schedule so this will be buried in the ground on Thanksgiving Day. I still have the bottom section to patina (the raised rug) so that will be buried in a week.